What became glaringly obvious is the need to paint. So, using plumbers cement, I glued the flanges onto the caps. Then put a couple coats of primer on, reading the air intake covers for a spray coat.
Although for right project, I really could allow
myself to sit and watch paint dry....I have other things to do
Reinstalling the cabinet base was job #1
Once that was done I needed to do a little tin bashing and create a little duct from the heater-A/C unit. First was to create a template of the mounting face.
It was a small job....1 3/4" length of the duct to the flange.
In the end I was quite happy with how things turned out.
I think that's a wrap....for now.
BEFORE
AFTER
No comments:
Post a Comment