Part of the issue was....to install the inverter I need to access the battery bank. To access the battery bank I need to remove the back bench cabinets....to remove the bench cabinets, I need to disconnect the furnace ducting.So likie many times before, to kove forward I must take a step back.
After much ado, the battery bank was unearthed(just for the record....and so I remember the battery bank has 440 amp hours)
Now that the batteries are accessed, I needed to make cables. From the batteries to the in line fuse(jeff is installing). From the fuse to the inverter.
Then from the inverter to the sub panel.
Once the panel was installed I could run plugs.....or specifically one plug....for now.
Once the plug was ready....we needed the bathroom walls. No, not because the bathroom was being installed for this trip, but we needed somewhere to install the......
TV
No comments:
Post a Comment